
Case Study
EPDM Outlet Close-Up
A detailed look at the scope, the challenges we solved and the final result.
Selected system
EPDM membrane
Scope of work
Hand-formed EPDM outlet dressing around a parapet drain.
Challenging details
Every fold and collar must be permanent - outlets are where roofs are made or lost.
Solution
Membrane worked around the outlet with bonded collars and reinforcement, then pressure-checked.
Finished result
A quiet, invisible detail that will stay watertight for the life of the roof.
